Customization: | Available |
---|---|
Product Type: | PVC Board |
Board Layers: | Multilayer |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
PAR T1 THIS LINE CONSISTS OF (COMPULSORY) | ||||
1 | Extruder model | SJSZ80/156 + SJ65/30 | ||
2 | Capacity | 350kg/h+50kg/h | ||
3 | Sheet specifications | Width: 720/880/1040mm Wave pitch:160mm Wave length:220mm Wave height:30mm Thickness:1-3mm |
||
4 | Emboss rollers | 1400mm*Φ300mm | ||
5 | T-die head | JC-Times brand | ||
6 | Corrugation forming machine max haul off power | 20KN | ||
7 | Haul off speed | 0.3-5m/min | ||
8 | Cutting machine | Pneumatic saw cutting | ||
9 | Stacker | 6m | ||
10 | Ridge tiles forming machine | With end cover, slope ridge for step roof, T ridge for step roof, top ridge for step roof | ||
PART 2 ACCESSORY MACHINE PARTS (OPTIONAL) | ||||
11 | High speed hot and cold mixer | 1 set | ||
12 | Plastic crusher | 1 set | ||
13 | Plastic pulverizer | 1 set | ||
14 | Air compressor | 1 set | ||
15 | Industrial water chiller | 1 set | ||
PART 3 SHEET SPECIFICATIONS | ||||
1 | Sheet width | 720/880/1040mm | ||
2 | Sheet thickness | 1-3mm | ||
PART 4 SHEET APPLICATIONS | ||||
1 | The glazed roofing tiles are wised in the garden-style factory, tourist scenic spots, pavillions, hotels, family building etc. | |||
PART 5 PAYMENT, DELIVERY AND AFTER SALE SERVICES | ||||
1 | Payment terms | 40% for prepayment by T/T, 60% for balanced payment by T/T, or L/C can be acceptable | ||
2 | Delivery time | 60 days after receipt of prepayment | ||
3 | Packing method | Wooden cases/pallets with stretching films | ||
4 | Guaranteed time | 18 months for mechanical parts, 12 months for electrical parts | ||
5 | After sale service | Send 1-2 engineers to customers' factory to help them install, test the machine, and train their workers. This is chargeable | ||